1
/
of
0
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
Regular price
$17.99 USD
Regular price
$45.00 USD
Sale price
$17.99 USD
Unit price
/
per
Couldn't load pickup availability
Description:
- LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
- GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
- LONG DOG LEAD- Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs
Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI
Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead
Share
📦 32424 In Stock 📦
📦 772 In Stock 📦
📦 32424 In Stock 📦
📦 772 In Stock 📦
📦 772 In Stock 📦
📦 772 In Stock 📦
📦 32424 In Stock 📦
Collections
-
Chic Gentle Human+Pets welln̈ess & educational toys plus MORE!
Chic humans pets store plus more! Pet your pets and save money....
-
Chic. Gentle Human/Pets highest quality products plus more!
Affordable highest quality products. For all human and pets . Affordable Services...